Flood Doctor was hired to mitigate damages to over 60,000 square feet of the facility after a wastewater line flooded the entire basement of the hospital. Due to the class and category of loss many precautions had to be taken and extensive testing was...

After a major storm, the city of Baltimore main sewage lines backed up into this building filling the basement with 9 feet of category 3 water. The entire 6,000 sqft basement, which also served as a cafeteria with a full restaurant style kitchen, was demolished...

Due to multiple construction mishaps on the top floors of this building, this modern spa located in the basement level of the building was affected with several sewage back-ups over the course of 3 months....