Sewage loss – Travelers Insurance Co. Major Case Unit.
All mechanical, electrical, and metal framing of the basement were also replaced. Drywall and drop ceilings were replaced and painted. 4,000 sqft of VCT tile and two thousand sqft of ceramic tile was installed.
In addition to replacing and installing all kitchen equipment, all bathrooms, elevators, and kitchens were brought up to ADA codes.